Tuesday, July 05, 2022 06:32 PM
Electricity consumption plays a major role in operation of Sewerage Treatment Plants/Water Treatment Plant. In order to make the Assets of Water supply and Underground Drainage schemes of ULBs of Gujarat self-sustainable and to deliver the duties towards betterment of Environment and reducing finical burdens of ULBs, Solar Projects have been introduced at various locations (STP, WTP and pumping station) in the ULBs of Gujarat. GUDC has been designated as the nodal agency by the State Government for implementation of solar projects in 8 Locations of 8 ULBs (STP) of Gujarat vide GR dated 24/06/19 in Phase I with 2052 kW installation capacity, In 9 Locations of 6 ULBs (STP/WTP) of Gujarat vide GR dated 17/12/19 in Phase II with 1242 kW installation capacity, In 16 Locations of 11 ULBs (STP/WTPs) of Gujarat vide GR dated 20/03/2020 in Phase III with 2835 kW installation capacity and at 41 locations of 11 ULBs (STP/WTP/Pumping station) of Gujarat vide GR dated 06/04/21 in Phase IV with 2598 kW installation capacity, totalling to 74 Locations of 34 ULBs and 8728 kW.