Tuesday, January 19, 2021 04:56 AM
Electricity consumption plays a major role in operation of Sewerage Treatment Plants. It is decided by the State Government to use solar panel in STP/WTP for saving of electricity consumption. GUDC has been designated as the nodal agency by the State Government for implementation of solar projects in 8 STP of Gujarat vide GR dated 24/06/19 in Phase I, In 9 STP/WTP of Gujarat vide GR dated 17/12/19 and In 16 STP/WTPs of Gujarat vide GR dated 20/03/2020.
M/s. TUV SUD South Asia and M/s. Gujarat Energy Research and Management Institute (GERMI) are empanelled for Providing Consultancy Services such as preparation of Detailed Feasibility Report, Tender Preparation, Bid Evaluation, Module Mounting Structure (MMS) design drawing and Third Party Engineering / Inspection (TPE/TPI). Till date, GUDC floated tenders for setting up of solar plant at 7 STP sites in Phase I and 4 STP/WTP in phase II.